Risk Considerations in the Use of Unmanned Aerial Vehicles in the Construction Industry
- ECU Author/Contributor (non-ECU co-authors, if there are any, appear on document)
- John Buckeridge (Creator)
- Jimmy Chong (Creator)
- Colin Duffield (Creator)
- Donna Hollar (Creator)
- Wei Hu (Creator)
- Jie Li (Creator)
- Dongryeol Ryu (Creator)
- Susan Sayger (Creator)
- George Wang (Creator)
- Zhen Zhu (Creator)
- Institution
- East Carolina University (ECU )
- Web Site: http://www.ecu.edu/lib/
Abstract: "The use of unmanned aerial vehicles (UAVs) in the construction industry is swiftly growing worldwide. UAVs
are changing the way construction companies do business. Contractors are increasingly using camera-mounted
UAVs to monitor the full range of activities. Rapid advances in camera, sensing, aeronautics, battery and
autopilot navigation technologies have helped make UAVs affordable, reliable and easy to operate. The US
Federal Aviation Administration predicts that UAVs hold tremendous promise and commercial drone sales
could increase from 600,000 to 2.7 million over the next four years. On the one hand, UAVs are extremely
cost-effective in conducting aerial surveys, worksite surveillance, real-time inspections, and monitoring jobsite
safety. On the other hand, with UAV ownership rapidly rising, the number of reported UAV safety, risk, and
liability incidents is increasing. With this new technology use in the construction industry, construction
companies must be aware of all regulations, legislations, privacy liability, and risks for construction related
businesses. Operating a drone or hiring a subcontractor to operate it is not something to do on the spur of the
moment. Emphasis and effort should be placed on safety, risk control, training and education. The goal of this
paper is to provide construction professionals with timely and pertinent information on UAV use with a focus
on risk management based on current industry practice, experience and literature review."
Additional Information
- Publication
- Other
- Language: English
- Date: 2016
- Keywords
- Drone, Risk, Unmanned Aerial Vehicle (UAV), Construction, Unmanned Aircraft System (UAS), Management